On-Site With JT Testing a Ring Final Circuits (Sockets) (Read Description)

JT did operate the socket switches during both tests at the sockets but this may have been lost in the edit. Remember to leave the socket switches on for the insulation resistance test 👍.

Please remember this learner is working towards his qualification and is not currently registered as a Part P domestic installer. The installation with be tested again by his QS and notified through the correct channels as required.

Videos are training aids for City and Guilds (C and G) and EAL courses Level 1, 2 and 3.

Clink the link below to follow me and my learners on Facebook.

https://www.facebook.com/gshelectrical/